PES Project Profile

P.S. 120

Queens, New York

Project Details

  • Project Cost: $411,000
  • Project Awarded: October 2011
  • Design Completed: May 2012
  • Construction Completed: May 2013

  • Scope of Services

    Mechanical / HVAC Design
    Electrical Design

    Client Reference

    Mr. Vergiliu Vlad, P.E.
    Design Project Manager
    NYC School Construction Authority
    A&E Design Consultant Management
    Tel: 718-472-8702


Auditorium HVAC Upgrades

Princeton Engineering Services provided Mechanical, Electrical Engineering & Design as the MEP Prime Consultant for the Heating, Ventilating and Air Conditioning Upgrades for the school Auditorium, consisting of removal of existing blower unit and provision of new Modular Air Handling Unit with DX cooling coil. Said packaged unit included all necessary equipment, components and piping; factory-installed to reduce construction costs. The new unit was installed in the same location as the existing blower to minimize ductwork modification. New Air-Cooled Condensing Unit (ACCU) associated with the Modular Air Handling Unit is located outside on grade and adjacent to the Fan Room.


Electrical, Mechanical & HVAC Design