PES Project Profile

William McKinley
School

Brooklyn, New York

Project Details

  • Project Client: NYC School Construction Authority
  • Project Cost: $400,000
  • Design Awarded: 1/2019
  • Design Completed: In Progress
  • Construction Completed: Not Started

  • Scope of Services

    • Local Sound System Replacement
    • Public Address Speakers Installation


Gymnasium Upgrade

Princeton Engineering Services (PES) is providing electrical design and construction administration services for the upgrade of the existing public address system in the fourth-floor gymnasium.

Six existing ceiling-mounted local sound system speakers are being replaced with two new public address horn speakers and connected to the local sound system. The local sound system design includes a gymnasium sound system control, ceiling mounted speakers, and a wireless microphone system to replace the existing portable speaker system and wired microphones.

A gymnasium sound system mixer is also added and connected to the existing school wide public address system. A two-channel power amplifier and an audio amplification system are also being added to the local sound system to accommodate the hearing impaired.


Sound System Replacement, Public Address Speakers Installation