Project Details

  • Project Cost: $2.5 million
  • Design Awarded: November 2013
  • Design Completed: June 2015
  • Project Completed: Ongoing

  • Scope of Services

    • Steam Boilers Systems
    • High Pressure Steam Lines
    • Civil Engineering
    • Structural Engineering


    Client Reference

    Mr. Nural Hasan
    Design Manager
    NJDPMC
    33 West State Street
    Trenton, NJ 08625
    Tel: 609-633-8265


Steam Line Replacement

PES scope of Work is to create construction documents & provide construction administrations services to install about 2000 feet of a 10” high pressure steam and 4” pumped condensate piping system from an above ground connection point on the Albert C. Wagner Youth Correctional Facility to a below ground point near the East House on the Garden State Youth Correctional Facility


Civil & Structural Engineering