• High Pressure Steam Pipe Replacement
• High Pressure Condensate Return Line Replacement
• Condensate Pump Replacement
• Civil Engineering
• Structural Engineering
Princeton Engineering Services, PC (PES) was retained by the NJDPMC to create construction documents and provide construction administration services at the Albert C. Wagner Youth Correctional Facility in Chesterfield, NJ.
The scope of work for this project includes the installation of almost 2,000 feet of a 10” high pressure steam piping system along with a 4’ pumped condensate pumping system from an existing above ground point to a below ground point near the East House located on the Garden State Youth Correctional Facility.